The finished Williams Room at The Williams School, New London — cherry-paneled walls, granite fireplace and coffered ceiling, built by Sapia Builders to a Centerbrook Architects design

The Williams School · New London, Connecticut

The Williams Room

A 1950s assembly room taken back to the studs and rebuilt as a paneled hall — in one summer, between the last day of school and the first.

Centerbrook Architects designed it. The room is the school's main assembly and board room, and it had been a mid-century space of its era: acoustic tile ceiling, drapery, chandeliers. Centerbrook lined it in cherry — walls, coffers, columns, sills and door surrounds.

The aluminum window wall, the hollow-metal door frames and the concrete slab all stayed, and the new power was cut into the slab. None of it was plumb, square or level, and every piece of cherry in the room was scribed to it.

Demolition started June 7th. Asbestos abatement followed, by others, with the building closed to anyone under eighteen. Coffered ceiling was still going in on the ninth of August. The room opened with the school year.

I.

What Was There

The Williams Room before renovation — acoustic tile ceiling, chandeliers, drapery and painted walls
Before. Acoustic tile ceiling, chandeliers and drapery.
The original painted colonial mantel and slate hearth before renovation
The old painted mantel and slate hearth.
The room stripped to studs and ceiling grid, window wall exposed
Stripped out.
Masonry fireplace opening exposed, layout lines marked on the slab
Masonry opened up. Layout on the slab.
Existing ceiling structure and ductwork exposed above the grid
The ceiling opened above the grid.
II.

Working Around What Stayed

Deep cherry windowsill running the length of the window wall with a bronze linear register set into it
Deep cherry sill the length of the window wall, bronze linear register set into it.
Cherry wrap built around an existing hollow-metal door frame
Cherry wrapped over the existing hollow-metal frames. The doors never moved.
Projection screen and audio-visual rough-in in the open ceiling before the coffers were closed
Screen, speakers and projector roughed in before a single coffer closed. Nothing surface-mounted afterward.
Panels
Cherry veneer with cherry 1×3 stiles and rails, inset sticking at every panel
Kick
Cherry 1×6 at the typical wall; 1×3 at the window wall, held 3″ off the floor for air circulation
Windows
Existing aluminum, retained — cherry mullion caps and column wraps
Acoustics
½″ fabric-wrapped mineral panels above the wainscot
Ceiling
Coffered beams, painted, with AV and lighting integrated
Power
Trenched into the existing slab; outlets laid horizontal in the base
III.

Cherry

The cherry fireplace wall in raw unstained cherry before finishing
The fireplace wall in raw cherry, before stain.
Sapia crew on ladders installing cherry wall panels
Milled and installed in-house.
Completed cherry wall paneling below a painted coffered ceiling
Coffers in, panels up.
Cherry veneer sheet showing book-matched grain
Grain matched before anything was cut.
Stain samples laid out on cherry boards
Stain samples, laid on the actual stock.
Finished stained cherry panel with inset sticking detail
Finished panel. Inset sticking, mitered.
The Williams Memorial Institute seal cut into the granite fireplace jamb

Williams Memorial Institute, 1891

The school was founded in 1891 as the Williams Memorial Institute, endowed by Harriet Peck Williams as a memorial to her son and built to advance the education of girls. It moved to Mohegan Avenue in 1954 and became The Williams School.

The fireplace surround is granite out of a stone yard in Salem, twenty minutes up Route 82. The Institute's original seal was carved into the jamb stones for this job. A cherry mantel sits over it, and the existing masonry opening was widened to take the new firebox.

IV.

The Room

The finished room in use, board table and chairs under the coffered ceiling
The finished room, board table under the coffered ceiling.
Finished cherry mantel over the granite surround with the school seal
Mantel and surround.
New cherry door set into the building's existing granite masonry wall
New cherry door set into the existing granite wall.